|
Job
Num
|
Description
|
Location
|
Sectors
|
Services
|
|
1988-072
|
Hound Trail Subdivision
SWM Plan
|
Newmarket, Ontario
|
ENV
|
|
WR
|
|
|
1989-091
|
Carruthers Creek Sanitary
Forcemain Transients
|
Ajax, Ontario
|
W&S
|
|
HT
|
|
|
1990-291
|
Water Supply and
Distribution for the Romano Subdivision
|
City
of Vaughan, Ontario
|
W&S
|
|
HD
|
|
|
1990-331
|
Complaints in Hamilton 5A System - Event Investigation
|
Hamilton, Ontario
|
W&S
|
|
HT
|
INV
|
|
1990-351
|
Model and Tests of Pipe
Leakage - Event Investigation
|
Chesterville, Ontario
|
W&S
|
L&I
|
HT
|
INV
|
|
1990-353
|
Laboratory Testing of
Pipe Joints
|
Toronto, Ontario
|
W&S
|
L&I
|
HT
|
INV
|
|
1990-371
|
Ramore Sewage Outlet to Black River - Event Investigation
|
Whitby, Ontario
|
W&S
|
|
HD
|
INV
|
|
1991-011
|
Navigable Channel and
Marina Beach - Hydraulic Structures
|
Terrace
Bay, Ontario
|
ENV
|
|
C&R
|
|
|
1991-081
|
Tri-City System: Demand
Forecasts and Strategic Plan 末 IT
|
Cities in Region of Waterloo
|
W&S
|
|
HD
|
IT
|
|
1991-322
|
Erosion Protection Works
for Branch 3 of Harmony Creek
|
East
Whitby, Ontario
|
ENV
|
|
C&R
|
|
|
1991-401
|
Penstock Rupture at Lock
7 - Event Investigation
|
Welland
Canal, Ontario
|
P&C
|
L&I
|
HT
|
INV
|
|
1992-011
|
Proposed Island at Mouth of McVicar Creek - Project Review
|
Thunder
Bay, Ontario
|
ENV
|
|
C&R
|
|
|
1992-012
|
Spatial Flow Patterns in Peninsula Harbour - Field Tests
|
Marathon, Ontario
|
ENV
|
|
C&R
|
|
|
1992-383
|
Scour at McCormick Bridge - Project Review
|
Tampa, Florida, USA
|
ENV
|
|
C&R
|
INV
|
|
1992-431
|
Wavebreak Construction
and Dredging - Hydraulic Structures
|
Oakville, Ontario
|
ENV
|
|
C&R
|
|
|
1992-451
|
Thermal Discharge from
Cardinal Cogeneration Facility
|
Cardinal, Ontario
|
P&C
|
L&I
|
C&R
|
|
|
1993-461
|
Ajax Water Treatment Plant and Distribution Network
|
Ajax, Ontario
|
W&S
|
|
HT
|
|
|
1994-011
|
St. Mary痴 Rapid Habitat
Study using a 2D Hydraulic Model
|
Sault St. Marie, Ontario
|
P&C
|
|
C&R
|
|
|
1994-323
|
Bay-Con Subdivision SWM
Plan
|
Town
of Caledon, Ontario
|
ENV
|
|
WR
|
|
|
1994-491
|
Laidlaw Environmental
(Landfill) Expansion Site
|
Sarnia, Ontario
|
ENV
|
|
WR
|
|
|
1994-511
|
Al Masane Mine Supply
Reservoir 末 Hydraulic Structures
|
Al Masane, Saudi Arabia
|
M&I
|
|
WR
|
|
|
1994-531
|
Hydraulic Transient
Analysis of Ho Chi Minh Water Supply
|
Ho
Chi Minh City
Viet
Nam
|
W&S
|
|
HT
|
|
|
1994-541
|
Shoreline Erosion and
Setback Evaluation - Hydr. Structures
|
Etobicoke, Toronto, Ontario
|
ENV
|
|
C&R
|
|
|
1995-083
|
Ottawa South Reservoir Chlorine Mixing - Physical Model
|
Ottawa, Ontario
|
W&S
|
|
HD
|
|
|
1995-085
|
Water Transmission Line
from Buffalo Pound to Regina - HT
|
Regina, Saskatchewan
|
W&S
|
|
HT
|
|
|
1995-093
|
Water Transmission Line
from Lake Huron to London - HT
|
City
of London, Ontario
|
W&S
|
|
HT
|
|
|
1995-331
|
District Cooling Water
System - Hydraulic Structures
|
Toronto, Ontario
|
P&C
|
|
HT
|
|
|
1995-442
|
Shekak/Nagagami Hydro
Tailrace Filling and Shut-down - HT
|
Shekak
River, Ontario
|
P&C
|
|
HT
|
|
|
1995-471
|
Chlorine Mixing in Glen
Cairn Reservoir - Physical Model
|
Ottawa, Ontario
|
W&S
|
|
HD
|
|
|
1995-551
|
Databases for MTO
Crossings and SWM - IT
|
Toronto, Ontario
|
ENV
|
|
WR
|
IT
|
|
1995-553
|
Markland Woods Club vs.
MTO Legal Case
|
Toronto, Ontario
|
L&I
|
|
C&R
|
INV
|
|
1995-561
|
Outfall Mixing for Belleville Water Pollution Plant (WPCP)
|
Belleville, Ontario
|
W&S
|
|
C&R
|
|
|
1996-082
|
Glenmore Pump Station
Upgrade - Impact on Pressure Zone
|
Calgary, Alberta
|
W&S
|
|
HT
|
|
|
1996-551
|
Culvert Crossing
Assessments for Highways in MTO - IT
|
Halton
Region, Ontario
|
ENV
|
|
HD
|
IT
|
|
1996-591
|
Hydraulic Transient
Review of Ottawa Water Network
|
Ottawa, Ontario
|
W&S
|
|
HT
|
|
|
1996-621
|
Gallagher Hill Park Combined Sewer Break
|
Edmonton, Alberta
|
W&S
|
|
HT
|
INV
|
|
1997-411
|
Boulder Valley Mine Treatment Plant - Goldstrike Mine
|
Elko, Nevada, USA
|
M&I
|
|
HT
|
|
|
1997-501
|
Block 17 Water System -
Water System Distribution System
|
Vaughan, Ontario
|
W&S
|
|
HD
|
|
|
1997-591
|
Hydraulic Transients on
the Orleans-Cumberland Collector
|
Ottawa, Ontario
|
W&S
|
|
HD
|
|
|
1997-611
|
Kerrowood North SWM
Spillway 末 Structure Failure Case
|
Newmarket, Ontario
|
ENV
|
|
HD
|
INV
|
|
1997-651
|
Repeated Pipe Breaks 末
Event Investigation
|
Muskoka, Ontario
|
W&S
|
|
HT
|
INV
|
|
1998-011
|
Erosion in
Neebing-McIntyre Floodway
|
Thunder
Bay, Ontario
|
ENV
|
|
WR
|
|
|
1998-502
|
Water Supply for
Downsview Base Lands
|
City
of Toronto, Ontario
|
W&S
|
|
HD
|
|
|
1998-701
|
Oakdale Golf and Country
Club vs North York 末 Legal Case
|
North York, Toronto, Ontario
|
L&I
|
|
C&R
|
INV
|
|
1998-731
|
Collingwood to Alliston
Feeder Main 末 Project Review
|
New Tecumseh, Ontario
|
W&S
|
|
HT
|
INV
|
|
1999-011
|
Increased Flow from Loch Lomond Reservoir to Carp River
|
Thunder
Bay, Ontario
|
ENV
|
|
C&R
|
|
|
1999-012
|
Drop Shaft and Tunnel 末
Fennel to Greenhill Trunk
|
Hamilton, Ontario
|
W&S
|
|
HD
|
|
|
1999-083
|
Western Beaches Storage
Tunnel 末 Analysis and Review
|
Toronto, Ontario
|
W&S
|
|
HT
|
INV
|
|
1999-332
|
York-Durham Sewerage
System 末 Transient Review
|
York & Durham, Ontario
|
W&S
|
|
HT
|
|
|
1999-411
|
Barrick Roaster Plant
& Tailings Lines 末 Analysis & Review
|
Nevada, U.S.A.
|
M&I
|
|
HT
|
|
|
1999-412
|
Humber Wastewater Treatment Plant 末 Analysis &
Review
|
Toronto, Ontario
|
W&S
|
|
HT
|
|
|
1999-413
|
HWY 407 W. Extension:
Culvert Crossings 末 Project Review
|
Oakville, Ontario
|
ENV
|
|
WR
|
|
|
1999-414
|
HWY 407 W Extension:
Median Drainage Alternatives
|
Oakville, Ontario
|
ENV
|
|
HD
|
|
|
1999-415
|
HWY 407 W Extension:
Proposed 16 Mile Creek Bridge Piers
|
Etobicoke, Toronto, Ontario
|
ENV
|
|
C&R
|
|
|
1999-665
|
Binbrook Sewage Pumping
Station 末 Transient Analysis
|
Wentworth, Ontario
|
W&S
|
|
HT
|
|
|
1999-761
|
Penstock 4, Sir Adam Beck
1 Station 末 Event Investigation
|
Niagara, Ontario
|
P&C
|
|
HT
|
INV
|
|
2000-011
|
Transient Analysis of
Entire Water Network (& Crossings)
|
Thunder
Bay, Ontario
|
W&S
|
|
HT
|
|
|
2000-368
|
HGL of MH5 on High Glen Ave 末 Hydraulic Structures
|
Markham, Ontario
|
ENV
|
|
HD
|
INV
|
|
2000-372
|
SWM and Erosion for 200
ha Markham Centre
|
Markham, Ontario
|
ENV
|
|
WR
|
|
|
2000-373
|
Surface Runoff Hydrology
and Hydraulics for Park Lake
|
Markham, Ontario
|
ENV
|
|
WR
|
|
|
2000-376
|
SWM Infiltration Pond for
Deer Ridge Subdivision
|
Uxbridge, Ontario
|
ENV
|
|
WR
|
|
|
2000-411
|
Pascua Lama Mine Complex
末 Basic Engineering Review
|
Argentina
|
M&I
|
|
HD
|
|
|
2000-412
|
Feeder Main from Lake
Victoria to Bulyanhulu
Mine 末 HT
|
Tanzania
|
M&I
|
|
HT
|
INV
|
|
2000-501
|
Bell Mobility SWM Pond
Outlet 末 Hydraulic Structures
|
Mississauga, Ontario
|
ENV
|
|
HD
|
|
|
2000-661
|
Mid-Block Arterial Sewage
Pump Station and Forcemain
|
Region of Halton, Ontario
|
W&S
|
|
HT
|
|
|
2000-782
|
Hydraulic of
Pre-treatment Headworks 末 Woodward WWTP
|
Hamilton, Ontario
|
W&S
|
|
HD
|
|
|
2000-791
|
Emergency Wilket Ck.
Crossing 末 Event Investigation
|
Toronto, Ontario
|
ENV
|
|
C&R
|
INV
|
|
2000-801
|
Watermain for Toronto Airport Expansion
|
Burnside and Associates
|
W&S
|
|
HT
|
|
|
2000-802
|
Water Line from Alliston
to Beeton 末 Transient Analysis
|
Alliston/Beeton, Ontario
|
W&S
|
|
HT
|
|
|
2001-501
|
Eastgate SWM Pond Outlet
末 Hydraulic Structures
|
Mississauga, Ontario
|
ENV
|
|
HD
|
|
|
2001-781
|
Greenhill CSO Tank System
Expansion 末 Hydraulic Review
|
Hamilton, Ontario
|
W&S
|
|
HD
|
|
|
2001-782
|
Greenhill Drop Shaft
Physical Model
|
Hamilton, Ontario
|
W&S
|
|
HD
|
|
|
2001-791
|
Field Test (Tracer Study)
of Baffled Chlorine Contact Chamber
|
Brantford, Ontario
|
W&S
|
|
HD
|
|
|
2002-801
|
Pump Tests and Model
Calibration 末 Suction NPSH
|
Peel & Chatham, Ontario
|
W&S
|
|
HD
|
|