|
|
ENVIRONMENTAL |
|
|||
| HYDRAULICS | |||||
| GROUP INC. |
| Hydraulic design and analysis is a key service provided by EHG, which includes the following hydraulic aspects: | |
|
|
|
EHG has been consulted on every one of Barrick Gold's refinery plant projects in the last 4 years including the largest refinery built in the world to date. While EHG's services are of significant value at the beginning of a project to identify and eliminate potential hydraulic constraints at the pre-design/conceptual level, EHG has also provided effective remedial solutions to optimize existing systems, and project reviews to analyse the effectiveness of existing systems. If you are looking for ways to optimise your hydraulic processes, improve safety standards, decrease maintenance & operational costs, and/or decrease your insurance premiums EHG's services may provide significant solutions. |
|
| Client/Location | Description | |
|
EMC Group Ltd. |
Water Supply and Distribution for the Romano Subdivision | 1990-291 link |
|
Totten Sims Hubicki |
Ramore Sewage Outlet to the Black River - Event Investigation | 1990-371 link |
|
Acres & Associates Ltd. |
Tri-City Water System: Demand Forecasts and Strategic Plan - IT | 1991-081 link |
|
Acres and Associated Ltd. |
Ottawa South Reservoir Chlorine Mixing - Physical Model | 1995-083 link |
|
Ottawa (City of) |
Chlorine Mixing in Glen Cairn Reservoir - Physical Model | 1995-471 link |
| MTO
- Central Region |
Culvert Crossing Assessments for Highways in MTO - IT | 1996-551 link |
| RAND
Engineering Corp. |
Block 17 Water System - Water System Distribution System | 1997-501 link |
| Ottawa
(City of) |
Hydraulic Transients on the Orleans-Cumberland Collector | 1997-591 link |
| York
(Region of) |
Kerrowood North SWM Spillway - Hydraulic Structure Failure Case | 1997-611 link |
| RAND
Engineering Ltd. |
Water Supply for Downsview Base Lands & Secondary Plan Area | 1998-502 link |
| Earth
Tech (Canada) Inc. |
Drop Shaft and Tunnel Alternatives - Fennel to Greenhill Sanitary Trunk | 1999-012 link |
|
SLF Joint Venture |
HWY 407 Western Extension: Median Drainage Alternatives - H. Structures | 1999-414 link |
| Masongsong
and Asso. |
HGL and Modification of MH5 on High Glen Ave - Hydraulic Structures | 2000-368 link |
| Barrick
Gold c/o SNC-Lavalin |
Pascua Lama Mine Complex - Basic Engineering Review | 2000-411 link |
| RAND
Engineering |
Bell Mobility SWM Pond Outlet Drop and Outfall - Hydraulic Structures | 2000-501 link |
| Azurix
North America |
Hydraulic Analysis of Pre-treatment Headworks - Woodward WWTP | 2000-782 link |
| Akira
& Associates |
Eastgate SWM Pond Outlet Drop and Outfall - Hydraulic Structures | 2001-501 link |
| Hamilton
(City of) |
Greenhill CSO Tank System Expansion - Hydraulic Review | 2001-781 link |
| Hamilton
(City of) |
Greenhill Drop Shaft Physical Model | 2001-782 link |
| Anderson
(R.V.) Assoc. |
Field Test (Tracer Study) of Baffled Chlorine Contact Chamber | 2001-791 link |
| Dillon
Consultant Ltd. |
Field Tracer Study of Carlisle Wells in Flamborough | 2002-093 n/a |
| Barrick
Gold c/o SNC Lavalin |
Hydraulic Review of Leeville Mine Gravity Pipeline System | 2002-412 n/a |
| Peel
& Chatham |
Pump Tests and Model Calibration –– Suction NPSH | 2002-801 link |
| Zenon
|
Dynamic Simulation of Rapid Tank and Draining System | 2003-651 n/a |
| Peel /
York Region |
EHG Projects for Peel to York Water Supply | 2003-880 link |
|
|
EHG Projects for WTP and Mining / Industrial Plants | 2003-882 n/a |
|
|
EHG Projects for Physical Modeling Laboratory & Field Test | 2003-883 n/a |
|
|
EHG Projects for Reservoir Chlorination in a Water System | 2003-886 n/a |
Last Updated: September 2003