The engineers at Environmental Hydraulics Group Inc. (EHG) have carried out numerous investigations to assess the on-site conditions for adverse hydraulic (i.e waterhammer) and/or environmental issues. This document outlines a methodology developed by EHG to facilitate investigations and reporting. Adverse hydraulic and/or environmental forces impact society and EHG is committed to helping clients understand and resolve these impacts. EHG is retained to resolve complex issues at all stages: i) preliminary/conceptual design/feasibility, ii) implementation/construction and iii) review/forensic investigations. Benefits at Each Stage |
|
| Stage 1: |
Preliminary / Conceptual Design / Feasibility |
| Stage 2: | Implementation / Construction |
| Stage 3: | Review / Forensic Investigations |
| Client/Location | Description | |
| Hamilton
(City of) |
Complaints in the Hamilton 5A Water System - Event Investigation | 1990-331 link |
| Ontario
Ministry of the Environment (MOE) |
Computer Model and Tests of Pipe Leakage - Event Investigation | 1990-351 link |
| Ontario
Ministry of the Environment (MOE) |
Laboratory Testing of Pipe Joints | 1990-353 link |
|
Totten Sims Hubicki |
Ramore Sewage Outlet to the Black River - Event Investigation | 1990-371 link |
| Fasken
Campbell Godfrey, Barristers and Solicitors |
Penstock Rupture at Lock 7, Welland Canal - Event Investigation | 1991-401 link |
| Parsons
Brinckerhoff Quade & Douglas Inc. |
Scour at McCormick Bridge - Project Review | 1992-383 link |
|
MTO - Central Region c/o Miller Thompson |
Markland Woods Country Club vs. MTO Legal Case - Event Investigation | 1995-553 link |
|
Edmonton (City of) |
City of Edmonton Combined Sewer Break - Event Investigation | 1996-621 link |
| York
(Region of) |
Kerrowood North SWM Spillway - Hydraulic Structure Failure Case | 1997-611 link |
|
H.H. Angus and Associates |
Repeated Pipe Breaks - Event Investigation | 1997-651 link |
|
Goldman, Sloan, Nash & Haber |
Oakdale Golf and Country Club vs North York - Legal Case | 1998-701 link |
| Ontario
Clean Water Agency (OWCA) |
Collingwood to Alliston Feeder Main - Project Review | 1998-731 link |
| MacViro
Consultants Inc. |
Western Beaches Storage Tunnel - Transient Analysis and Review | 1999-083 link |
|
Ontario Power Generation |
Penstock 4, Sir Adam Beck 1 Station -- Event Investigation | 1999-761 link |
| Masongsong
and Asso. |
HGL and Modification of MH5 on High Glen Ave - Hydraulic Structures | 2000-368 link |
| Barrick
Gold c/o SNC-Lavalin |
Feeder Main from Lake Victoria to Bulyanhulu Mine -- HT | 2000-412 link |
| Morrison
Hershfield Ltd. |
Emergency Wilket Ck. Crossing at Lawrence Ave - Event Investigation | 2000-791 link |
| Inco
|
Pump / Pipe Breaks in Hill Station, Clarabelle, Nickel Mine | 2001-411 n/a |
| QIT
Fer et Titane Inc. |
Hydraulic for UGS Plant Processing and Heat Exchange | 2001-412 n/a |
| Dillon
Consultant Ltd. |
Field Tracer Study of Carlisle Wells in Flamborough | 2002-093 n/a |
| Anderson
(R.V.) Assoc. |
Hydraulic Study of Somerset CSO Tunnel(Ontario) | 2002-791 n/a |
| David
McManus Eng. |
Pipe Failure in Richmond Sanitary Forcemain | 2003-281 n/a |
|
|
EHG Projects for International Coastal Waters | 2003-881 n/a |
|
|
EHG Projects for Pump / Pipe Break Investigation | 2003-884 n/a |
|
|
EHG Projects for Reservoir Chlorination in a Water System | 2003-886 n/a |
|
|
EHG Projects for Industrial Sectors | 2003-887 n/a |