The use of small hydro electric plants is prevalent in Ontario and the hydraulic components of these plants serve multiple uses. Their primary purpose is to provide power to the industry and the public; however a secondary function is to reuse the energy (i.e. hot water) to provide heating for the facility and sometimes surrounding consumers' homes and businesses. EHG has investigated cooling and heating water systems, hydro tailrace and shutdown issues, and two different types of Penstock investigations impacting a canal and generating station respectively. |
| Client/Location | Description | |
| Fasken
Campbell Godfrey, Barristers and Solicitors |
Penstock Rupture at Lock 7, Welland Canal - Event Investigation | 1991-401 link |
| Stikeman
Elliott |
Impact of Thermal Discharge from Cardinal Cogeneration Facility - Event Investigation | 1992-451 link |
|
Dept. of Fisheries & Oceans |
St. Mary's Rapid Habitat Study using a 2D Hydraulic Model | 1994-011 link |
|
MacViro Consultants Ltd |
District Cooling Water System - Hydraulic Structures | 1995-331 link |
|
Algonquin Power Corp. |
Shekak/Nagagami Hydro Tailrace Filling and Shut-down - HT | 1995-442 link |
|
Ontario Power Generation |
Penstock 4, Sir Adam Beck 1 Station -- Event Investigation | 1999-761 link |
|
|
EHG Projects for Industrial Sectors | 2003-887 n/a |