| Client/Location | Description | |
| Dillon
Consultant Ltd. |
Carruthers Creek Sanitary Forcemain Transients | 1989-091 link |
|
EMC Group Ltd. |
Water Supply and Distribution for the Romano Subdivision | 1990-291 link |
| Hamilton
(City of) |
Complaints in the Hamilton 5A Water System - Event Investigation | 1990-331 link |
| Ontario
Ministry of the Environment (MOE) |
Computer Model and Tests of Pipe Leakage - Event Investigation | 1990-351 link |
| Ontario
Ministry of the Environment (MOE) |
Laboratory Testing of Pipe Joints | 1990-353 link |
|
Totten Sims Hubicki |
Ramore Sewage Outlet to the Black River - Event Investigation | 1990-371 link |
|
Acres & Associates Ltd. |
Tri-City Water System: Demand Forecasts and Strategic Plan - IT | 1991-081 link |
| Simcoe
Engineering Group |
Ajax Water Treatment Plant and Distribution Network Transients | 1993-461 link |
| Schonfeld
Ltd. |
Hydraulic Transient Analysis of Ho Chi Minh Water Supply | 1994-531 link |
|
Acres and Associated Ltd. |
Ottawa South Reservoir Chlorine Mixing - Physical Model | 1995-083 link |
| Associated
Engineering |
Water Transmission Line from Buffalo Pound to Regina - HT | 1995-085 link |
|
M.M. Dillon Ltd. |
Water Transmission Line from Lake Huron to London - HT | 1995-093 link |
|
Ottawa (City of) |
Chlorine Mixing in Glen Cairn Reservoir - Physical Model | 1995-471 link |
| W2O
Inc. |
Outfall Mixing for Belleville Water Pollution Control Plant (WPCP) | 1995-561 link |
| Associated
Eng. Ltd. |
Glenmore Pump Station Upgrade - Impact on Pressure Zone HT | 1996-082 link |
| Ottawa
(City of) |
Hydraulic Transient Review of Ottawa-Carleton's Water Network | 1996-591 link |
|
Edmonton (City of) |
City of Edmonton Combined Sewer Break - Event Investigation | 1996-621 link |
| RAND
Engineering Corp. |
Block 17 Water System - Water System Distribution System | 1997-501 link |
| Ottawa
(City of) |
Hydraulic Transients on the Orleans-Cumberland Collector | 1997-591 link |
|
H.H. Angus and Associates |
Repeated Pipe Breaks - Event Investigation | 1997-651 link |
| RAND
Engineering Ltd. |
Water Supply for Downsview Base Lands & Secondary Plan Area | 1998-502 link |
| Ontario
Clean Water Agency (OWCA) |
Collingwood to Alliston Feeder Main - Project Review | 1998-731 link |
| Earth
Tech (Canada) Inc. |
Drop Shaft and Tunnel Alternatives - Fennel to Greenhill Sanitary Trunk | 1999-012 link |
| MacViro
Consultants Inc. |
Western Beaches Storage Tunnel - Transient Analysis and Review | 1999-083 link |
|
MacViro Consultants Inc. |
York-Durham Sewerage System - Hydraulic Transient Review | 1999-332 link |
| SNC-Lavalin |
Humber Wastewater Treatment Plant - Transient Analysis and Review | 1999-412 link |
|
Aldworth Engineering Inc. |
Binbrook Sewage Pumping Station - Hydraulic Transient Analysis | 1999-665 link |
|
Earth Tech Canada Inc. |
Transient Analysis of Entire Water Network (& Crossings) | 2000-011 link |
|
KMK Consultants Ltd. |
Mid-Block Arterial Sewage Pump Station and Forcemain Transients | 2000-661 link |
| Azurix
North America |
Hydraulic Analysis of Pre-treatment Headworks - Woodward WWTP | 2000-782 link |
|
Burnside and Associates |
Trunk Watermain for Toronto Airport Expansion - Transient Analysis | 2000-801 link |
|
Town of New Tecumseth |
Water Line from Alliston to Beeton - Transient Analysis | 2000-802 link |
| Hamilton
(City of) |
Greenhill CSO Tank System Expansion - Hydraulic Review | 2001-781 link |
| Hamilton
(City of) |
Greenhill Drop Shaft Physical Model | 2001-782 link |
| Anderson
(R.V.) Assoc. |
Field Test (Tracer Study) of Baffled Chlorine Contact Chamber | 2001-791 link |
| Ainley
|
Hanlan Low-Lift Pump Station Upgrade and Zone 3 Network | 2001-802 n/a |
| Dillon
Consultant Ltd. |
Field Tracer Study of Carlisle Wells in Flamborough | 2002-093 n/a |
| Barrick
Gold c/o SNC Lavalin |
Hydraulic Review of Leeville Mine Gravity Pipeline System | 2002-412 n/a |
| Anderson
(R.V.) Assoc. |
Hydraulic Study of Somerset CSO Tunnel(Ontario) | 2002-791 n/a |
| Peel
& Chatham |
Pump Tests and Model Calibration –– Suction NPSH | 2002-801 link |
| David
McManus Eng. |
Pipe Failure in Richmond Sanitary Forcemain | 2003-281 n/a |
| MacViro
Consultants/KMK |
Peel / York Feedermain and Zone 6 Network | 2003-332 n/a |
| Zenon
|
Dynamic Simulation of Rapid Tank and Draining System | 2003-651 n/a |
| Peel /
York Region |
EHG Projects for Peel to York Water Supply | 2003-880 link |
| Great
Lake Areas |
EHG Projects for International Coastal Waters | 2003-881 n/a |
| N. and S.
America & Africa |
EHG Projects for WTP and Mining / Industrial Plants | 2003-882 n/a |
| Four
Continents |
EHG Projects for Pump / Pipe Break Investigation | 2003-884 n/a |
| Across
Canada |
EHG Projects for Legal Investigations | 2003-885 n/a |
| Ontario,
Canada |
EHG Projects for Reservoir Chlorination in a Water System | 2003-886 n/a |
Last Updated: September 2003